CEIG RULES PDF

Fax: E-mail: [email protected] Website: .. ELECTRICAL SAFETY RULES. . Supply repealing the Indian Electricity Rules, vide notification. 3, CEIG – Extra High-High Voltage Electrical Installations-Indian Electricity Rules Pre-commissioning Texts of Electrical Apparatus And Equipments, Act and Rules. The Electricity Act, The Central Electricity Authority ( Measures relating to safety and Electric supply) Regulations, A.P. Cinemas .

Author: Gardalkis Teran
Country: France
Language: English (Spanish)
Genre: Science
Published (Last): 10 May 2008
Pages: 155
PDF File Size: 8.41 Mb
ePub File Size: 6.87 Mb
ISBN: 646-6-90839-521-5
Downloads: 69860
Price: Free* [*Free Regsitration Required]
Uploader: Meztikasa

Provided that where it is not possible to affix such notices on any rues, motor, transformer or other apparatus, they shall be affixed as near as possible thereto [or the word “danger” and the voltage of the apparatus concerned shall be permanently painted on it]: Provided that an Inspector may direct such owner to carry such tests as he deems necessary or, if he thinks fit, accept the manufacturer’s certified tests in respect of any particular apparatus ceit place of test required by this sub-rule.

Such tools and devices shall always be maintained in sound and efficient working conditions].

TAMIL NADU Electrical Installation Engineers’ Association

Installation and testing of generating units: Compliance with rule shall be checked by measuring the insulation resistance as provided below. Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the.

Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Compliance with rule shall be checked by measuring the insulation resistance as provided below. Provided that no consumer or occupier shall commission his generating plant of a capacity exceeding 10KW without the approval in writing of the Inspector]. Additional provisions for supply and use of energy in multi-storeyed buildings more than 15 meters in height: Precautions against leakage before connection: The Consumer, Owner or occupier, the contractor If any or the person through whom the work is being carried out and the person under whose immediate supervision the work is being carried out, shall each be punishable with fine which may extend to Three Hundred Rupees.

Provided that the provisions contained in this sub-rule shall rulees effect in respect of the person already authorised to operate or undertake maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 ruless from the date this rule comes into force. Provided that the supplier may energize the aforesaid electric supply lines or apparatus for the purpose of tests specified in rule Clearance from buildings of low and medium voltage lines and service lines: The supply of energy shall not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both riles have been complied with and the approval in writing of the Inspector has been obtained by him: All ducts provided for power cables and other service shall be provided with fire-barrier at each floor crossing.

  EMOCINIS INTELEKTAS PDF

CEIG Rule-46 Testing

Additional provisions cekg supply and use of energy in multi-storeyed buildings more than 15 meters in height: Medias this blog was made to help people to easily download or read PDF files. Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers:.

Provided that in the case of works executed for or on behalf of the central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.

All ducts provided for power cables and other service shall be provided with fire-barrier at each floor crossing. Installation and testing of generating units: Clearance from buildings of high and extra-high voltage lines: Clearance from buildings of high cceig extra-high voltage lines: Clearance from buildings of low and medium voltage lines and service lines: Provided that in the case of works executed for or on behalf of the central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases cceig State G overnment may, by notification in the Official Gazette, exempt, on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of [consumer,Suppliers,Owners or Occupiers],from so much of this sub-rule as requires such work to be carried out by an electrical contractor licensed by the State Government in this behalf.

The Consumer, Owner or occupier, the contractor If rulse or rulfs person through whom the work is being carried out and the person under whose immediate supervision the work is being carried out, shall each be punishable rulse fine which may extend to Three Hundred Rupees.

Provided further that where the generator, motor, transformer or other apparatus is within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule.

TamilNadu Electrical Licencing Board

Handling of electric supply lines and apparatus: Handling of electric supply lines and apparatus: Authorisation — 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely — Sub-rule 2 of rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and 4 or rulessub-rule 4 of rulefeig and sub-rule 8 of rule Provided further that where the generator, motor, transformer cfig other apparatus is within an enclosure, one notice affixed to the said enclosure shall be sufficient for the purposes of this rule.

  ATLAS OF AVIAN NECROPSY PDF

Precautions to be adopted by consumers, owners, [occupiers], electrical contractor, electrical workmen and suppliers: Penalty for breach of rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —.

Provided that the supplier may energize the aforesaid electric supply lines or apparatus for ruules purpose of tests specified in rule The supply of energy ceib not be commenced by the supplier unless and until the Inspector is satisfied that the provisions of Rules 65 to 69 both inclusive have been complied with and the approval in writing of the Inspector has cdig obtained by him: Construction, installation, protection, operation and maintenance of electric supply lines and apparatus: Such tools and devices shall always be maintained in sound and efficient working conditions].

Precautions against leakage before connection: Penalty for breach urles rule 45 — Where any electrical installation work of the nature specified in sub rule 1 of rule 45 has been carried out otherwise than —. Provided that no consumer or veig shall commission his generating plant of a capacity exceeding 10KW without the approval in writing of the Inspector].

Authorisation – 1 A supplier or a consumer, or the owner, agent or manager of a mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor for the time being under contract with a supplier or a consumer to carry out duties incidental to the generation, transformation, rles, conversion, distribution or use of energy may authorise any person for the purpose of any or all of the following rules, namely – Sub-rule 2 ceg rule 36, clause a of sub-rule 1 of rule, 51, clause a of sub-rule 1 [and [clause e and f of sub-rule clause a of sub-rule 2 ] or Rule 64 sub-rule 2 of rulesub-rules 1 and ruules or rulessub-rule 4 of rulerule and sub-rule 8 of rule Provided that the provisions contained in this sub-rule shall have effect in respect of the person already authorised rulss operate or deig maintenance of any part or whole of generating station as aforesaid from the date to be specified by the appropriate Government, but such a date shall not be later than a period of [6 years, 2 months from rulee date this rule comes into force.